Chemical & Synthetic Fibers Plants

Sterols Plant

Savannah Georgia

Southern Industrial conducts pipe welding structural steel erection projects on any scale.

Southern Industrial performed work on all steel structures, as well as mechanical, electrical, and instrumentation work on this project.

Scope of work included:

  • installation of main process tower structural steel (450T)
  • installation of all piperack steel throughout facility
  • installation of process equipment, including tank farm storage vessels, pumps, distillation tower (including internals), three large evaporators and other equipment in the process tower, cooling tower, hot oil heater, and firewater pumphouse

Piping portion or the project included:

  • installation of approximately 7,000 lft of double walled SS pipe
  • over 33,000 lft of CS and SS spooled pipework
  • supply and installation of over 6,000 lft of field run utility pipe

 Systems installed and supplied included:

  • steam trace and jacketed pipe system
  • installation of instruments, instrument tubing and capillary systems
  • installation of owner furnished MCC room and control panels