Charlotte, NC

Confidential Chemical Client 2

SIC performed equipment, piping, electrical, and controls systems—and fast-tracked time and materials—for this major plant upgrade.

Piping system at a chemical plant facility

Value Delivered

Southern Industrial Constructors (SIC) installed equipment, process and utility piping, electrical systems, controls, and heat tracing for this plant upgrade.

We leveraged our vast capabilities and client experience to help fast-track the schedule and materials. To expedite piping production, we established an onsite fabrication shop. We have a strong relationship with the client, spanning 20-plus years and over 50 projects across the Southeastern region.

Client Objectives

The client needed to increase production capacity at their Charlotte, NC chemical plant in order to make up for lost capabilities from a recently closed facility.

Solutions

SIC installed plant equipment including tanks, pumps, and process equipment. Our scope included:

  • Providing structural steel for access platforms, pipe racks, etc.
  • Fabricating process and utility piping in-house
  • Installing electrical and controls systems
  • Heat tracing

Client Background

The client is a leading chemical manufacturer.